expres:sa1
SA1
Production e-VLBI Service
White Paper:
- Towards e-EVN: e-VLBI and the use of lightpaths, A. Szomoru (JIVE), B. Peeters, N. den Otter, E. Bos (SURFNet)
e-VLBI operator manual:
e-VLBI Tests
- 26 October 2006 (detailed report)
- 29 January 2007 (with 2 February follow-on run)
Plots, graphs and images of e-VLBI runs
Calls for e-VLBI Proposals
Calls are for reference only and are non-authoritative. See the EVN Web site for official calls and other information.
Related Materials
Completed deliverables:
WP1 (Operational Improvements for e-VLBI)
- DSA1.10: Real-time data processor control software
- DSA1.2: Job preparation utilities
- DSA1.27: Space craft tracking correlator mode
- DSA1.31: Removing/adding stations from the correlations process on the fly
- DSA1.23: Use of WSRT synthesis data for e-VLBI calibration
- DSA1.24: Mark5A code modifications
- DSA1.25: Mark5B code modifications
- DSA1.28: On-the-fly fringe fitting
- DSA1.30: Automated correlator diagnostics
- DSA1.34: Mixed-mode operations
WP2 (Data Transmission Developments)
- DSA1.1: Central Data Link Control
- Correlator Control Code modifications
- DSA1.5: Network Protocol decision
- A Simulation model for e-VLBI traffic on network links in the Netherlands , J. Sansa, A. Szomoru, J.M. van der Hulst
- On Network Monitoring of end-to-end paths used for e-VLBI , J. Sansa, A. Szomoru, J.M. van der Hulst
- UDP-like TCP M. Kettenis
- DSA1.18: Network monitoring tools
- DSA1.26: Investigating a 1024M sub-array
- DSA1.20: Improved network applications
- DSA1.35: 1024 Mbps e-VLBI and beyond
- e-VLBI beyond the 1Gb/s speedbump, P. Boven, 7th International e-VLBI Workshop, 16-17 June 2008, Shanghai, China
- Metsahovi four-Gbps data recorder for VLBI and eVLBI , Y. Ritakari, J. Wagner, G. Molera, 7th International e-VLBI Workshop, 16-17 June 2008, Shanghai, China
- iBob data acquisition and network streaming , J. Wagner et al., 7th International e-VLBI Workshop, 16-17 June 2008, Shanghai, China
WP3 (Target of Opportunity Support)
- DSA1.1.3: Fast/adaptive scheduling tools
- DSA1.11: Real-time pipeline
- DSA1.12: visibility monitor
- DSA1.6: Selective data processor controls
- DSA1.3: Fast/adaptive scheduling tools
- Dynamic scheduling of the e-EVN D. Small
- DSA1.29: Real-time download and extraction of station information
WP4 (Real-time Monitoring Functions)
- DSA1.8/1.21: monitoring processes/monitoring user interfaces
WP5 (Data Processor Upgrades)
- DSA1.17: Flexible local GE network
- DSA1.22: Mark5 hardware upgrade
- DSA1.16: VSI support software
Presentations:
- e-VLBI Status @ JIVE, A. Szomoru, TOG Meeting, 24 March 2006, Dwingeloo, The Netherlands
- VLBI in Transition, A. Szomoru, SPIE Conference “Ground-based and Airborne Telescopes”, 24-31 May 2006, Orlando, USA
- New Use of an Old Correlator, A. Szomoru, Next Generation Correlators for Radio Astronomy and Geodesy, 27-29 June 2006, Groningen, The Netherlands
- Status of e-VLBI @ JIVE, A. Szomoru, Bits & Bytes Meeting, 31 August 2006, Jodrell Bank Observatory, Jodrell Bank, United Kingdom
- e-VLBI Developments at JIVE, A. Szomoru, 5th International e-VLBI Workshop, 17-20 September 2006, MIT Haystack Observatory, USA
- Recent e-EVN Developments, A. Szomoru, 8th EVN Symposium, 26-29 September 2006, Torun, Poland
- e-EVN developments in 2006, A. Szomoru, 5th EVN-NREN Meeting, 31 October 2006, Zaandam, the Netherlands
- SA1: overview, first results, A. Szomoru, EXPReS Kickoff Meeting, 31 October 2006, Zaandam, the Netherlands
- SMART-1: using e-VLBI to track satellites, A. Szomoru, SURFNet Gigaport Seminar, 2 November 2006, Utrecht, the Netherlands
- Recent e-EVN Developments, A. Szomoru, Shanghai Observatory, 10 November 2006, Shanghai, China
- EVN and e-VLBI, A. Szomoru, China Science and Technology Network (CSTNET), 13 November 2006, Beijing, China
- e-EVN: practical considerations, A. Szomoru, e-VLBI Science Advisory Committee Meeting, 28 November 2006, Westerbork, the Netherlands & EVN Board Meeting, 29 November 2006, Dwingeloo, the Netherlands
- e-EVN: practical considerations, A. Szomoru, Bits & Bytes Meeting, 7 December 2006, Manchester, United Kingdom & TOG Meeting, 4 December 2006, Noto, Italy
- EVN and e-VLBI, A. Szomoru, ESLEA Closing Conference, 26-28 March 2007, Edinburgh, United Kingdom
- SA1: Production e-VLBI service, A. Szomoru, EXPReS Annual Review, 17 April 2007, Brussels, Belgium
- e-VLBI Using high-speed networks to enable new astronomy, A. Szomoru, TERENA Networking Conference, 21-24 May 2007, Copenhagen, Denmark
- SA1: Production e-VLBI service, A. Szomoru, EXPReS Board meeting, 29 May 2007, Metsahovi, Finland
- SA1: Technical Progress, A. Szomoru, eVSAG face-to-face meeting, 28 June 2007, Gothenburg, Sweden
- EXPReS SA1: at the half-way mark, A. Szomoru, 6th International e-VLBI workshop, 17 September 2007, Bonn, Germany
- Update on EXPReS activities in 2007, A. Szomoru, EVN-NREN meeting, 19 September 2007, Bonn, Germany
- EXPReS progress, Mark5 and e-VLBI, A. Szomoru, TOG meeting, 12 November 2007, Yebes, Spain
- Update on JCCS, B. Eldering, EXPReS Board Meeting, 30 January 2008, Utrecht, The Netherlands
- Towards real-time e-VLBI operation: scheduling, monitoring and calibrating, D. Small, EXPReS Board Meeting, 30 January 2008, Utrecht, The Netherlands
- SA1: Second Year Overview, A. Szomoru, EXPReS Board Meeting, 30 January 2008, Utrecht, The Netherlands
- Radio Astronomy in the era of high-speed networks, A. Szomoru, STOA/TERENA Workshop, 2 April 2008, Brussels, Belgium
- e-VLBI Networking Challenges, P. Boven, NORDUnet 2008, 9-11 April 2008, Espoo, Finland
- e-EVN: a real-time telescope larger than Europe, H. J. van Langevelde, Terena Networking Conference, 19-22 May 2008, Bruges, Belgium
- SA1: Production e-VLBI service, A. Szomoru, EXPReS Annual Review, 30 May 2008, Brussels, Belgium
- e-VLBI beyond the 1Gb/s speedbump, P. Boven, 7th International e-VLBI Workshop, 16-17 June 2008, Shanghai, China
- 4 Gigabit Onsala - Jodrell lightpath for e-VLBI - The iNet test unit - Development of real time eVLBI at Jodrell Bank Observatory, R. Hughes-Jones, 7th International e-VLBI Workshop, 16-17 June 2008, Shanghai, China
- e-EVN science projects (2006-2008), Z. Paragi, 7th International e-VLBI Workshop, 16-17 June 2008, Shanghai, China
- EXPReS and the e-EVN, A. Szomoru, 7th International e-VLBI Workshop, 16-17 June 2008, Shanghai, China
- The road to 980Mbps eVLBI, H. Verkouter, 7th International e-VLBI Workshop, 16-17 June 2008, Shanghai, China
- iBOB data acquisition and network streaming, J. Wagner, 7th International e-VLBI Workshop, 16-17 June 2008, Shanghai, China
- e-VLBI: a real-time telescope of intercontinental dimensions, H. J. van Langevelde, 2008 URSI General Assembly, 7-16 August 2008, Chicago, USA
- EVN/JIVE technical developments, A. Szomoru, TOG meeting, 22 September 2008, Bologna, Italy
- Dynamic scheduling of the e-EVN: a progress report, D. Small, TOG meeting, 22 September 2008, Bologna, Italy
- EXPReS and the e-EVN, A. Szomoru, 9th International European VLBI Symposium, 23-26 September 2008, Bologna, Italy
- e-VLBI: real-time radio astronomy, A. Szomoru, 8th Annual GLIF Workshop, 1-2 October 2008, Seattle, USA
- EXPReS and the e-EVN, A. Szomoru, EVN Science Day, 3 November 2008, Arecibo, Puerto Rico
- International Lightpath Experiences, P. Boven, TERENA E2E Workshop, 1-2 December 2008, Amsterdam, The Netherlands
- EVN/JIVE Technical Developments, A. Szomoru, TOG meeting, 17 April 2009, Torun, Poland
- e-EVN Update, A. Szomoru, EVN Board Meeting, 26 May 2009, Gothenburg, Sweden
- e-EVN Progress, 3 years of EXPReS, A. Szomoru, 8th International e-VLBI Workshop, 22-26 June 2009, Madrid, Spain
expres/sa1.txt · Last modified: 2009/09/08 09:09 by 127.0.0.1