User Tools

Site Tools


expres:fabric:wp1_scalable_connectivity

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Next revision
Previous revision
expres:fabric:wp1_scalable_connectivity [2012/12/03 12:34] – created jive_adminexpres:fabric:wp1_scalable_connectivity [2012/12/03 12:53] (current) – [1.2.3 Broadband integration and test] jive_admin
Line 16: Line 16:
  
 ==== 1.1.3 Data acquisition control ==== ==== 1.1.3 Data acquisition control ====
-  * D66: Data Acquisition Interface Design. Rottmann et al.  {{fabric:d66_rottmann_dataacquisitioninterfacereport.pdf| d66.pdf}} +  * D66: Data Acquisition Interface Design. Rottmann et al.  {{expres:fabric:d66_rottmann_dataacquisitioninterfacereport.pdf| d66.pdf}} 
-  * D76: Data Acquisition Test Report. Rottmann {{fabric:d76_rottmann_dataacquisitiontestreport.pdf| d76.pdf}}+  * D76: Data Acquisition Test Report. Rottmann {{expres:fabric:d76_rottmann_dataacquisitiontestreport.pdf| d76.pdf}}
  
 ===== WP1.2 Broadband data path ===== ===== WP1.2 Broadband data path =====
Line 25: Line 25:
 ==== 1.2.1 Broadband protocols ==== ==== 1.2.1 Broadband protocols ====
 **Documents** **Documents**
-  * Protocol investigation for e-VLBI data-transfer. Strong et al.  {{fabric:fabricprotocols1.2.1.001-corrected_date.pdf|PDF version of document}}+  * Protocol investigation for e-VLBI data-transfer. Strong et al.  {{expres:fabric:fabricprotocols1.2.1.001-corrected_date.pdf|PDF version of document}}
  
  
Line 33: Line 33:
 **Documents** **Documents**
   * Export/Import of VLBI Data from/to eMerlin. Bryan Anderson {{expres:expimpvlbidata_emerlin.pdf}}   * Export/Import of VLBI Data from/to eMerlin. Bryan Anderson {{expres:expimpvlbidata_emerlin.pdf}}
-  * Minutes of Get-Together Meeting. 1 Sept 2006 {{fabric:fabric_wp1_2_2_gettogethermeeting.doc}}+  * Minutes of Get-Together Meeting. 1 Sept 2006 {{:expres:fabric:fabric_wp1_2_2_gettogethermeeting.doc|}}
  
 ==== 1.2.3 Broadband integration and test ==== ==== 1.2.3 Broadband integration and test ====
   * Telecom on zeroth order PC-EVN demonstration: {{expres:mom20060522.txt}}   * Telecom on zeroth order PC-EVN demonstration: {{expres:mom20060522.txt}}
-  * FABRIC Month 7 demo report {{:fabric:fabric1_2_3_month7jec3.pdf}}+  * FABRIC Month 7 demo report {{:expres:fabric:fabric1_2_3_month7jec3.pdf|}}
  
 ==== 1.2.4 Public to dedicated network interface ==== ==== 1.2.4 Public to dedicated network interface ====
-  * LOFAR connection strategic document {{:fabric:lofar_-_connection_strategic_document_1.3.doc|version 1.3}} - replaces previous version+  * LOFAR connection strategic document {{expres:fabric:lofar_-_connection_strategic_document_1.3.doc|version 1.3}} - replaces previous version
expres/fabric/wp1_scalable_connectivity.1354538085.txt.gz · Last modified: 2012/12/03 12:34 by jive_admin