User Tools

Site Tools


expres:test

Deliverables Table

D# A AD# Descrip Plan Actual Status Nature DisLev
D1NA4NA4.01Creation of Public EXPReS web-site 2 1 4 O PU
D2JRA1J1.1Data acquisition requirements document2 ? ? RPU
D3JRA1J1.2Protocols strategic document2 ? ? RPU
D4NA2NA2.01EVN-NREN meeting No. 1 (under auspices of EXPReS) 1) 3 6 3 R PP
D5SA1SA1.1Central data link control3 ? ? DPU
D6NA3NA3.1First meeting of eVSAG under auspices of EXPReS4 ? ? RPP
D7NA4NA4.02Creation of EXPReS web-based management tools 4 4 4 O PP
D8JRA1J1.3Visualization software4 ? ? PPU
D9JRA1J1.4Correlator design specification5 ? ? RPU
D10NA4NA4.03Generation of PR material (phase 1: logos and posters, PowerPoint template, press releases and news clippings, brochure) 6 1 x O PU
D11SA1SA1.2Job preparation utilities6 ? ? DPU
D12SA1SA1.3Fast/adaptive scheduling tools6 ? ? DPU
D13SA2SA2.01Feasibility study of the last-mile connection to the nearest NREN node for participant CNIG-IGN6 ? ? RPU
D14SA2SA2.02Feasibility study of the last-mile connection to the nearest NREN node for participant MPIfR6 ? ? RPU
D15SA2SA2.03Equipment of the last-mile infrastructure for participant INAF (telescope in Medicina)6 ? ? OPU
D16SA2SA2.04Feasibility study of the last-mile connections to the nearest GEANT NREN node for participant CAS (Shanghai, Urumqi, Miyun, Yunnan )6 ? ? RPU
D17SA2SA2.05Feasibility study of the last-mile connection to the nearest NREN node for participant VIRAC6 ? ? RPU
D18SA2SA2.06Feasibility study of the last-mile connection to the nearest NREN node for participant HRAO6 ? ? RPU
D19SA2SA2.07Feasibility study of the last-mile connection to the nearest NREN node for participant NAIC (Arecibo)6 ? ? RPU
D20SA2SA2.08 Feasibility study of the last-mile connection to the nearest NREN node for participant TIGO6 ? ? RPU
D21SA2SA2.09Feasibility study of the last-mile connection to AARNET for participant CSIRO6 ? ? RPU
D22JRA1J1.5Overall design document6 ? ? RPU
D23JRA1J1.6eVLBI-Grid design document 6 9 4 R PU
D24JRA1J1.7eVLBI fringes PC-EVN7 ? ? DPU
D25JRA1J1.8LOFAR connection strategic document7 ? ? RPU
D26JRA1J1.9Data acquisition design document8 ? ? RPU
D27SA1SA1.4eMERLIN VSI interfaces design9 ? ? PPU
D28SA1SA1.5Selective data processor controls9 ? ? DPU
D29SA2SA2.10e-VLBI test observations, Medicina10 ? ? RPU
D30JRA1J1.10eVLBI-Grid interface document10 ? ? RPU
D31NA2n/aNA2 annual report No. 2 (as part of EXPReS Ann. Rep No. 2)24 ? ? ? ?
D32NA1NA1.01Annual report (incl. Financial information) to EC 12 ? ? RPP
D33NA2NA2.02NA2 annual report No. 1 (as part of EXPReS Ann. Rep No. 1)12 ? ? RPP
D34NA4NA4.04e-VLBI Demonstration and attendance at Network events (events, presentations)12 ? x OPU
D35SA1SA1.5Network Protocol decision12 ? ? DPU
D36SA1SA1.7Monitored information handling modules12 ? ? DPU
D37SA2SA2.011Equipment of the last-mile infrastructure for participant MRO12 ? ? OPU
D38SA2SA2.12Construction and equipment of the last-mile infrastructure for participant CNIG-IGN12 ? ? OPU
D39SA2SA2.13 Construction and equipment of the last-mile infrastructure for participant MPIfR12 ? ? OPU
D40SA1SA1.8Monitoring processes12 ? ? DPU
D41JRA1J1.11Protocols performance report13 ? ? RPU
D42JRA1J1.12Software correlator core14 ? ? PPU
D43JRA1J1.13Software data product15 ? ? PPU
D44SA1SA1.10Real-time data processor control software15 ? ? PPU
D45SA1SA1.9Tests using local Jodrell Bank home e-MERLIN telescope15 ? ? DPU
D46NA3NA3.2eVSAG meeting No. 216 ? ? RPP
D47SA1SA1.11Real-time Pipeline16 ? ? DPU
D48NA2NA2.03EVN-NREN meeting No. 2 18 ? ? RPP
D49NA4NA4.05 Generation of new PR material (phase 2: display stand and merchandise)18 ? ? OPU
D50SA1SA1.12Visibility monitor18 ? ? DPU
D51SA1SA1.13Tested software for operational improvements18 ? ? DPU
D52SA1SA1.14Test using remote e-MERLIN telescope18 ? ? DPU
D53SA1SA1.16 VSI support software18 ? ? DPU
D54SA1SA1.15 VSI Interfaces18 ? ? DPU
D55SA2SA2.1410 Gbps link upgrade between MERLIN and JIVE18 ? ? OPU
D56SA2SA2.15e-VLBI test observations, Metsahovi18 ? ? RPU
D57SA2SA2.16Construction and equipment of the last-mile infrastructure for participant Shanghai18 ? ? OPU
D58SA2SA2.17 Construction and equipment of the last-mile infrastructure in AARNET to allow connection of participant CSIRO18 ? ? OPU
D59SA2SA2.18Construction and equipment of the last-mile infrastructure for participant Urumqi18 ? ? OPU
D60SA2SA2.19 Construction and equipment of the last-mile infrastructure for participant Miyun18 ? ? OPU
D61SA2SA2.20 Construction and equipment of the last-mile infrastructure for participant Kunming18 ? ? OPU
D62SA2SA2.21 Construction and equipment of the last-mile infrastructure for participant VIRAC18 ? ? OPU
D63SA2SA2.22 Equipment of the last-mile infrastructure for participant NAIC18 ? ? OPU
D64SA2SA2.23 Construction and equipment of the last-mile infrastructure for participant TIGO18 ? ? OPU
D65SA2SA2.24AARNET connectivity enhancements18 ? ? O PU
D66JRA1J1.14Data acquisition interface document18 ? ? RPU
D67JRA1J1.15LOFAR station interface report18 ? ? RPU
D68JRA1J1.16Software for workflow management18 ? ? PPU
D69SA2SA2.25Feasibility study of the last-mile connection to the nearest GÉANT node for participant INAF (Sardinia)20 ? ? RPU
D70SA2SA2.26 10 Gbps link between UniMan and OSO for ultra-VLBI tests20 ? ? OPU
D71SA1SA1.17 Flexible local GE network21 ? ? DPU
D72SA2SA2.27e-VLBI test observations, Effelsberg21 ? ? RPU
D73SA2SA2.28e-VLBI test observations, Metsahovi22 ? ? RPU
D74SA2SA2.29e-VLBI test observations, Yebes22 ? ? RPU
D75JRA1J1.17Software for correlation on cluster23 ? ? PPU
D76JRA1J1.18Data acquisition test report23 ? ? RPU
D77JRA1J1.19Data acquisition prototype at telescope23 ? ? PPU
D78JRA1J1.20Overall broadband demonstration23 ? ? DPU
D79JRA1J1.21Software cluster correlation23 ? ? PPU
D80JRA1J1.22First fringes software correlator23 ? ? DPU
D81NA1NA1.02Annual report (incl. Financial information) to EC 24 ? ? RPP
D82NA2NA2.04NA2 annual report No. 2 (as part of EXPReS Ann. Rep No. 2)24 ? ? RPP
D83NA4NA4.06 e-VLBI Demonstration and attendance at Network events.24 ? ? OPU
D84SA1SA1.18Network monitoring tools24 ? ? DPU
D85SA1SA1.19Multiple e-MERLIN telescope tests24 ? ? DPU
D86SA2SA2.30 Construction and equipment of the last-mile infrastructure for participant HartRAO24 ? ? OPU
D87JRA1J1.23Software to collect distributed output24 ? ? PPU
D88NA2NA2.05EVN-NREN meeting No. 326 ? ? RPP
D89NA2NA2.06EVN-NREN representatives present EXPReS networking results at the e-VLBI Science & Technology Workshop 26 ? ? RPU
D90NA2n/aEVN-NREN meeting n/a ? ? ? ?
D91NA3NA3.3eVSAG meeting No. 326 ? ? RPP
D92JRA1J1.24Software to create data product from distributed correlation 27 ? ? PPU
D93JRA1J1.25Software routing29 ? ? PPU
D94NA3NA3.4e-VLBI Workshop held in Onsala30 ? ? OPU
D95SA1SA1.20 Improved network applications30 ? ? DPU
D96SA1SA1.21Monitoring user interfaces30 ? ? DPU
D97SA2SA2.31e-VLBI test observations, Urunqi30 ? ? RPU
D98SA2SA2.32e-VLBI test observations, Mijun30 ? ? RPU
D99SA2SA2.33e-VLBI test observations, Kunming30 ? ? RPU
D100SA2SA2.34e-VLBI test observations, VIRAC30 ? ? RPU
D101SA2SA2.35e-VLBI test observations, HRAO30 ? ? RPU
D102SA2SA2.36e-VLBI test observations, NAIC, Arecibo30 ? ? RPU
D103SA2SA2.37e-VLBI test observations, TIGO30 ? ? RPU
D104SA2SA2.38 Construction and equipment of the last-mile infrastructure for participant INAF (Sardinia)30 ? ? OPU
D105JRA1J1.26eMERLIN interface available30 ? ? PPU
D106JRA1J1.27Fringes with new routing31 ? ? DPU
D107NA3NA3.5Publication of e-VLBI Workshop proceedings32 ? ? RPU
D108JRA1J1.28 Software distributed correlation33 ? ? PPU
D109JRA1J1.29First fringes Grid correlator34 ? ? DPU
D110JRA1J1.30 First fringes on FABRIC35 ? ? DPU
D111NA1NA1.03 Annual report (incl. Financial information) to EC 36 ? ? RPP
D112NA1NA1.04 Final Report to Board and EC 36 ? ? RPP
D113NA1NA1.05 Final Plan for using and disseminating knowledge36 ? ? RPP
D114NA1NA1.06Implementation of the Gender Action Plan36 ? ? RPP
D115NA1NA1.07Raising public participation and awareness 36 ? ? RPU
D116NA2NA2.07NA2 annual & Final reports 36 ? ? RPP
D117NA4NA4.07 e-VLBI Demonstration and attendance at network events.36 ? ? OPU
D118JRA1J1.31Final report36 ? ? RPU
1)
meeting completed, official once Board Minutes are published
expres/test.txt · Last modified: 2007/05/11 14:15 by 127.0.0.1