====== !!! DRAFT !!! ====== This is a DRAFT version of the revised deliverables table. This draft includes the updates presented at the First Annual Review. There are still some checks that need to be run to make sure that all the information from the previous table was correctly integrated into this new table. -- tcy, 2007 may 16 ^D#^Lead^AD#^Deliverable Description^Planned^Actual^Status^Nature ^DisLev^ | D1 | NA4 | NA4.01 | Creation of Public EXPReS web-site | 2 | 1 | 4 | O | PU | | D2 | JRA1 | J1.1 | Data acquisition requirements document | 2 | 3 | 4 | R | PU | | D3 | JRA1 | J1.2 | Protocols strategic document | 2 | 2 | 4 | R | PU | | D4 | NA2 | NA2.01 | EVN-NREN meeting No. 1 (under auspices of EXPReS) (minutes) | 3 | 6 | 4 | R | PP | | D5 | SA1 | SA1.1 | Central data link control, Correlator Control Code modifications (not documented) | 3 | 7 | 4 | D | PU | | D6 | NA3 | NA3.1 | First meeting of eVSAG under auspices of EXPReS (minutes) | 4 | 9 | 4 | R | PP | | D7 | NA4 | NA4.02 | Creation of EXPReS web-based management tools | 4 | 4 | 4 | O | PP | | D8 | JRA1 | J1.3 | Visualization software | 4 | | -> | P | PU | | D9 | JRA1 | J1.4 | Correlator design specification 1) | 5 | | 3 | R | PU | | D10 | NA4 | NA4.03 | Generation of PR material (phase 1: logos and posters, PowerPoint template, press releases and news clippings, brochure) | 6 | 1 | x | O | PU | | D13 | SA2 | SA2.01 | Feasibility study (via protected link) of the last-mile connection to the nearest NREN node for participant CNIG-IGN | 6 | 9 | 4 | R | PU | | D14 | SA2 | SA2.02 | Feasibility study (via protected link) of the last-mile connection to the nearest NREN node for participant MPIfR | 6 | 9 | 4 | R | PU | | D15 | SA2 | SA2.03 | Equipment of the last-mile infrastructure for participant INAF (telescope in Medicina) (via protected link) | 6 | 9 | 4 | O | PU | | D16 | SA2 | SA2.04 | Feasibility study (via protected link) of the last-mile connections to the nearest GEANT NREN node for participant CAS (Shanghai, Urumqi, Miyun, Yunnan ) | 6 | 9 | 4 | R | PU | | D17 | SA2 | SA2.05 | Feasibility study (via protected link) of the last-mile connection to the nearest NREN node for participant VIRAC | 6 | 9 | 4 | R | PU | | D18 | SA2 | SA2.06 | Feasibility study (via protected link) of the last-mile connection to the nearest NREN node for participant HRAO | 6 | 9 | 4 | R | PU | | D19 | SA2 | SA2.07 | Feasibility study (via protected link) of the last-mile connection to the nearest NREN node for participant NAIC (Arecibo) | 6 | 9 | 4 | R | PU | | D20 | SA2 | SA2.08 | Feasibility study (via protected link) of the last-mile connection to the nearest NREN node for participant TIGO | 6 | 9 | 4 | R | PU | | D21 | SA2 | SA2.09 | Feasibility study (via protected link) of the last-mile connection to AARNET for participant CSIRO | 6 | 9 | 4 | R | PU | | D22 | JRA1 | J1.5 | Overall design document | 6 | | 0 | R | PU | | D23 | JRA1 | J1.6 | eVLBI-Grid design document | 6 | 9 | 4 | R | PU | | D24 | JRA1 | J1.7 | eVLBI fringes PC-EVN (Month 7 Demo report) | 7 | 7 | 4 | D | PU | | D25 | JRA1 | J1.8 | LOFAR connection strategic document | 7 | 11 | 4 | R | PU | | D26 | JRA1 | J1.9 | Data acquisition design document | 8 | 11 | 4 | R | PU | | D29 | SA2 | SA2.10 | e-VLBI test observations, Medicina (256 Mbps fringes) (science announcement) | 10 | 3 | 4 | D | PU | | D30 | JRA1 | J1.10 | eVLBI-Grid interface document | 10 | 10 | 4 | R | PU | | D119 | MRO | SA2.11 | Equipment of the last-mile infrastructure for participant MRO | 12 | | ongoing | O | PU | | D120 | CNIG-IGN | SA2.12 | Construction and equipment of the last-mile infrastructure for participant CNIG-IGN | 12 | | ongoing | R | PU | | D121 | MPIfR | SA2.13 | Construction and equipment of the last-mile infrastructure for participant MPIfR | 12 | | ongoing | | | | D32 | NA1 | NA1.01 | Annual report (incl. Financial information) to EC | 12 | | | | | | D33 | NA2 | NA2.02 | NA2 annual report No. 1 (as part of EXPReS Ann. Rep No. 1) | 12 | | | R | PP | | D34 | NA4 | NA4.04 | e-VLBI Demonstration and attendance at Network events (events, presentations) | 12 | 12 | x | R | PP | | D35 | SA1 | SA1.5 | Network Protocol decision: A Simulation model for e-VLBI traffic on network links in the Netherlands,Comparing Simulation and Network Monitoring Results, On Network Monitoring of end-to-end paths used for e-VLBI, UDP-like TCP | 12 | | 2 | O | PU | | D37 | SA2 | SA2.011 | Equipment of the last-mile infrastructure for participant MRO | 12 | 5 | 4 | D | PU | | D38 | SA2 | SA2.12 | Construction and equipment of the last-mile infrastructure for participant CNIG-IGN | 12 | | | O | PU | | D39 | SA2 | SA2.13 | Construction and equipment of the last-mile infrastructure for participant MPIfR | 12 | | | O | PU | | D40 | SA1 | SA1.8 | Monitoring processes | 12 | 7 | 4 | O | PU | | D122 | JBO | DJ1.11a | Interim Protocols performance report | 13 | | | | | | D123 | JIVE | DJ1.4 | Correlator design specification | 13 | | | | | | D41 | JBO | J1.11 | Protocols performance report | 13 | -- | -- | -- | -- | | D42 | JIVE | J1.12 | Software correlator core | 15 | | | R | PU | | D44 | SA1 | SA1.10 | Real-time data processor control software (no document) | 15 | 4 | 4 | P | PU | | D11 | JIVE | SA1.2 | Job preparation utilities | 16 | | 2 | D | PU | | D124 | JIVE | SA1.22 | Mark5 hardware upgrade | 16 | | | | | | D28 | JIVE | SA1.5 | Network protocol decision | 16 | | 2 | P | PU | | D46 | OSO | NA3.2 | eVSAG meeting No. 2 | 16 | | | D | PU | | D47 | SA1 | SA1.11 | Real-time Pipeline | 16 | 9 | 4 | R | PP | | D125 | JIVE | DJ1.5 | Overall design document | 17 | | | | | | D126 | JIVE | SA1.23 | Use of WSRT synthesis data for e-VLBI calibration | 17 | | | | | | D127 | O/S | SA1.24 | Mark5A code modifications | 17 | | | | | | D128 | O/S | SA1.25 | Mark5B code modifications | 17 | | | | | | D43 | JIVE | J1.13 | Software data product | 17 | | | P | PU | | D95 | O/S | SA1.20 | Improved network applications | 17 | | | P | PU | | D129 | HRAO | SA2.06 | Feasibility study of the last-mile connection to the nearest NREN node for participant HRAO | 18 | | ongoing | | | | D130 | MERLIN, JIVE | SA2.14 | 10 Gbps link upgrade between MERLIN and JIVE | 18 | | pendent | | | | D131 | MRO | SA2.15 | e-VLBI test observations, Metsähovi | 18 | 13 | | | | | D132 | AARNET, CSIRO | SA2.17 | Construction and equipment of the last-mile infrastructure in AARNET to allow connection of participant CSIRO | 18 | | | | | | D133 | VIRAC | SA2.21 | Construction and equipment of the last-mile infrastructure for participant VIRAC | 18 | | | | | | D134 | TIGO | SA2.23 | Construction and equipment of the last-mile infrastructure for participant TIGO | 18 | | | | | | D135 | AARNET | SA2.24 | AARNET connectivity enhancements | 18 | | | | | | D48 | JIVE | NA2.03 | EVN-NREN meeting No. 2 | 18 | | | D | PU | | D49 | JBO | NA4.05 | Generation of new PR material (phase 2) | 18 | | | R | PP | | D50 | SA1 | SA1.12 | Visibility monitor | 18 | 4 | 4 | O | PU | | D51 | JIVE | SA1.13 | Tested software for operational improvements | 18 | | | D | PU | | D55 | SA2 | SA2.14 | 10 Gbps link upgrade between MERLIN and JIVE | 18 | | | D | PU | | D56 | SA2 | SA2.15 | e-VLBI test observations, Metsahovi | 18 | 13 | 4 | O | PU | | D57 | SA2 | SA2.16 | Construction and equipment of the last-mile infrastructure for participant Shanghai | 18 | | | R | PU | | D58 | SA2 | SA2.17 | Construction and equipment of the last-mile infrastructure in AARNET to allow connection of participant CSIRO | 18 | | | O | PU | | D59 | SA2 | SA2.18 | Construction and equipment of the last-mile infrastructure for participant Urumqi | 18 | | | O | PU | | D60 | SA2 | SA2.19 | Construction and equipment of the last-mile infrastructure for participant Miyun | 18 | | | O | PU | | D61 | SA2 | SA2.20 | Construction and equipment of the last-mile infrastructure for participant Kunming | 18 | | | O | PU | | D62 | SA2 | SA2.21 | Construction and equipment of the last-mile infrastructure for participant VIRAC | 18 | | | O | PU | | D63 | SA2 | SA2.22 | Equipment of the last-mile infrastructure for participant NAIC | 18 | | | O | PU | | D64 | SA2 | SA2.23 | Construction and equipment of the last-mile infrastructure for participant TIGO | 18 | | | O | PU | | D65 | SA2 | SA2.24 | AARNET connectivity enhancements | 18 | | | O | PU | | D68 | PSNC | J1.16 | Software for workflow management | 18 | | | R | PU | | D71 | JIVE | SA1.17 | Flexible local GE network | 18 | | 1 | O | PU | | D136 | JIVE | SA1.26 | Investigating a 1024M sub-array | 20 | | | | | | D137 | INAF | SA2.25 | Feasibility study of the last-mile connection to the nearest GÉANT node for participant INAF (Sardinia) | 20 | | | | | | D138 | UniMan, OSO | SA2.26 | 10 Gbps link between UniMan and OSO for ultra-VLBI tests | 20 | | | | | | D69 | SA2 | SA2.25 | Feasibility study of the last-mile connection to the nearest GÉANT node for participant INAF (Sardinia) | 20 | | | P | PU | | D70 | SA2 | SA2.26 | 10 Gbps link between UniMan and OSO for ultra-VLBI tests | 20 | | | R | PU | | D139 | JIVE | DJ1.3 | Visualization software | 21 | | | | | | D140 | ShAO | SA2.16 | Construction and equipment of the last-mile infrastructure for participant Shanghai | 21 | | | | | | D141 | ShAO | SA2.18 | Construction and equipment of the last-mile infrastructure for participant Urumqi | 21 | | | | | | D142 | ShAO | SA2.19 | Construction and equipment of the last-mile infrastructure for participant Miyun | 21 | | | | | | D143 | ShAO | SA2.20 | Construction and equipment of the last-mile infrastructure for participant Kunming | 21 | | | | | | D144 | MPIfR | SA2.27 | e-VLBI test observations, Effelsberg | 21 | | | | | | D67 | ASTRON | J1.15 | LOFAR station interface report | 21 | | | R | PU | | D72 | SA2 | SA2.27 | e-VLBI test observations, Effelsberg | 21 | | | D | PU | | D145 | MRO, CSIRO | SA2.28 | e-VLBI test observations, Metsahovi / CSIRO | 22 | | | | | | D146 | OAN | SA2.29 | e-VLBI test observations, Yebes | 22 | | | | | | D45 | UniMan | SA1.9 | Tests using local Jodrell Bank home e-MERLIN telescope | 22 | | | P | PU | | D66 | MPI | J1.14 | Data acquisition interface document | 22 | | | O | PU | | D73 | SA2 | SA2.28 | e-VLBI test observations, Metsahovi | 22 | | | R | PU | | D74 | SA2 | SA2.29 | e-VLBI test observations, Yebes | 22 | | | R | PU | | D54 | JIVE | SA1.15 | VSI Interfaces | 23 | | | D | PU | | D75 | JIVE | J1.17 | Software for correlation on cluster | 23 | | | R | PU | | D79 | JIVE | J1.21 | Software cluster correlation | 23 | | | D | PU | | D80 | JIVE | J1.22 | First fringes software correlator | 23 | | | P | PU | | D147 | NAIC | SA2.22 | Equipment of the last-mile infrastructure for participant NAIC | 24 | | | | | | D31 | DANTE | NA2.04 | NA2 annual report No. 2 (as part of EXPReS Ann. Rep No. 2) | 24 | | | R | PU | | D52 | UniMan | SA1.14 | Test using remote e-MERLIN telescope | 24 | | | D | PU | | D81 | JIVE | NA1.02 | Annual report (incl. Financial information) to EC | 24 | | | D | PU | | D83 | JIVE | NA4.06 | e-VLBI Demonstration and attendance at Network events. | 24 | | | R | PP | | D85 | UniMan | SA1.19 | Multiple e-MERLIN telescope tests | 24 | | | D | PU | | D53 | JIVE | SA1.16 | VSI support software | 26 | | | D | PU | | D76 | MPI | J1.18 | Data acquisition test report | 26 | | | P | PU | | D77 | MRO/OSO | J1.19 | Data acquisition prototype at telescope | 26 | | | R | PU | | D88 | DANTE | NA2.05 | EVN-NREN meeting No. 3 | 26 | | | O | PU | | D89 | DANTE | NA2.06 | EVN-NREN representatives present EXPReS networking results at the e-VLBI Science & Technology Workshop | 26 | | | P | PU | | D91 | OSO | NA3.3 | eVSAG meeting No. 3 | 26 | | | R | PU | | D148 | JIVE | SA1.27 | Space craft tracking correlator mode | 27 | | | | | | D149 | HRAO | SA2.30 | Construction and equipment of the last-mile infrastructure for participant HartRAO | 27 | | | | | | D12 | JIVE | SA1.3 | Fast/adaptive scheduling tools | 28 | | 1 | D | PU | | D150 | JBO | DJ1.11b | Final Protocols performance report | 28 | | | | | | D151 | JIVE | SA1.28 | On-the-fly fringe fitting | 28 | | | | | | D93 | PSNC | J1.25 | Software routing | 29 | | | R | PP | | D100 | SA2 | SA2.34 | e-VLBI test observations, VIRAC | 30 | | | R | PU | | D101 | SA2 | SA2.35 | e-VLBI test observations, HRAO | 30 | | | R | PU | | D102 | SA2 | SA2.36 | e-VLBI test observations, NAIC, Arecibo | 30 | | | R | PU | | D103 | SA2 | SA2.37 | e-VLBI test observations, TIGO | 30 | | | R | PU | | D104 | SA2 | SA2.38 | Construction and equipment of the last-mile infrastructure for participant INAF (Sardinia) | 30 | | | R | PU | | D105 | JBO | J1.26 | eMERLIN interface available | 30 | | | R | PU | | D152 | JIVE | SA1.29 | Real-time download and extraction of station information | 30 | | | | | | D153 | VIRAC | SA2.34 | e-VLBI test observations, VIRAC | 30 | | | | | | D154 | TIGO | SA2.37 | e-VLBI test observations, TIGO | 30 | | | | | | D155 | INAF | SA2.38 | Construction and equipment of the last-mile infrastructure for participant INAF (Sardinia) | 30 | | | | | | D84 | JIVE | SA1.18 | Network monitoring tools | 30 | | | O | PU | | D87 | JIVE | J1.23 | Software to collect distributed output | 30 | | | D | PU | | D96 | SA1 | SA1.21 | Monitoring user interfaces | 30 | 7 | 4 | O | PU | | D97 | SA2 | SA2.31 | e-VLBI test observations, Urunqi | 30 | | | D | PU | | D98 | SA2 | SA2.32 | e-VLBI test observations, Mijun | 30 | | | D | PU | | D99 | SA2 | SA2.33 | e-VLBI test observations, Kunming | 30 | | | R | PU | | D106 | JIVE | J1.27 | Fringes with new routing | 31 | | | O | PU | | D92 | JIVE | J1.24 | Software to create data product from distributed correlation | 31 | | | | | | D94 | OSO | NA3.4 | e-VLBI Workshop held in Onsala | 31 | | | P | PU | | D107 | OSO | NA3.5 | Publication of e-VLBI Workshop proceedings | 32 | | | P | PU | | D108 | JIVE | J1.28 | Software distributed correlation | 33 | | | D | PU | | D156 | JIVE | SA1.30 | Automated correlator diagnostics | 33 | | | | | | D157 | ShAO | SA2.31 | e-VLBI test observations, Urunqi | 33 | | | | | | D158 | ShAO | SA2.32 | e-VLBI test observations, Mijun | 33 | | | | | | D159 | ShAO | SA2.33 | e-VLBI test observations, Kunming | 33 | | | | | | D160 | HRAO | SA2.35 | e-VLBI test observations, HRAO | 33 | | | | | | D78 | OSO | J1.20 | Overall broadband demonstration | 33 | | | P | PU | | D109 | JIVE | J1.29 | First fringes Grid correlator | 34 | | | R | PU | | D161 | JIVE | SA1.31 | Removing/adding stations from the correlation process on the fly | 34 | | | | | | D110 | JIVE | J1.30 | First fringes on FABRIC | 35 | | | P | PU | | D111 | JIVE | NA1.03 | Annual report (incl. Financial information) to EC | 36 | | | D | PU | | D112 | JIVE | NA1.04 | Final Report to Board and EC | 36 | | | D | PU | | D113 | JIVE | NA1.05 | Final Plan for using and disseminating knowledge | 36 | | | R | PP | | D114 | JIVE | NA1.06 | Implementation of the Gender Action Plan | 36 | | | R | PP | | D115 | JIVE | NA1.07 | Raising public participation and awareness | 36 | | | R | PP | | D116 | JIVE | NA2.07 | NA2 annual & Final reports | 36 | | | R | PP | | D117 | JIVE | NA4.07 | e-VLBI Demonstration and attendance at network events. | 36 | | | R | PU | | D118 | JIVE | J1.31 | Final report | 36 | | | R | PP | | D162 | JIVE | SA1.32 | Enhancements & additions to real-time pipeline | 36 | | | | | | D163 | JIVE | SA1.33 | Enhancements & additions to existing monitoring tools | 36 | | | | | | D164 | NAIC | SA2.36 | e-VLBI test observations, NAIC, Arecibo | 36 | | | | | | D36 | JIVE | SA1.7 | Monitored information handling modules | 36 | | | D | PU | | D82 | DANTE | NA2.08 | NA2 annual report No. 3 (as part of EXPReS Ann. Rep No. 3) | 36 | | | R | PP | | D90 | DANTE | NA2.09 | EVN-NREN meeting | n/a | n/a | n/a | -- | -- |