User Tools

Site Tools


tog:june-2024-goteborg

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revisionPrevious revision
Next revision
Previous revision
tog:june-2024-goteborg [2024/06/18 11:22] verkoutertog:june-2024-goteborg [2025/03/31 10:35] (current) poppi
Line 11: Line 11:
 == Tuesday 25 June 2023 == == Tuesday 25 June 2023 ==
  
-  * Start of the meeting 9:00 CET +//Coffee at the hotel from 08:30 CEST; target coffee/lunch breaks 10:00-10:30 CEST, 12:00-13:00 CEST, 15:00-15:30 CEST// 
-  Introduction, [[ https://deki.mpifr-bonn.mpg.de/Working_Groups/EVN_TOG/Current_Action_Items | Action Items ]] + 
-  Update by the TOG Chair (**Poppi**) +Start of the meeting 9:00 CEST 
-  Performance of the EVN (**Oh**) + 
-  Report from stations +  Introduction, [[ https://deki.mpifr-bonn.mpg.de/Working_Groups/EVN_TOG/Current_Action_Items | Action Items ]] 
-     - wide-band C/X status (**all**) +  Update by the TOG Chair (**Poppi**) 
-     - triband receiver status (**all**) +  - {{ :tog:evn_perfomance_tog_2024.pdf |Performance of the EVN}} (**Oh**) 
-       - BRAND receiver integration tests at Effelsberg (**Rahimi**) +  Report from stations 
-       - operations (commissioning tests?) (**Yang**) +      - wide-band C/X status (**all**) 
-     - DBBC3 status (**all**) +      - triband receiver status (**all**) 
-       - DBBC3 (e-VLBI) tests (**Eldering**) +      {{ :tog:tog2024_brand.pdf |BRAND receiver integration tests at Effelsberg}} (**Rahimi**) 
-       - 8-bit per sample tests (**Yang**) +      - operations (commissioning tests?) (**Yang**) 
-     - flexbuf / recorder can do >> 8 Gbps? (**all**) +      - DBBC3 status (**all**) 
-  System and network management at JIVE (**Buijs**) +          {{ tog:dbbc3-evlbi-test.pdf | DBBC3 (e-VLBI) tests }} (**Eldering**) 
-  Recorder status? +          {{ :tog:vlbi_test_observations_with_8-bit_vdif_data_high.pdf |8-bit per sample tests}} (**Yang**) 
-     - NcFTP station->JIVE slow speed (**Feiler, everyone**) +      - flexbuf / recorder can do >> 8 Gbps? (**all**) 
-  RFI monitoring, CRAF, SpaceX/Starlink (**Winkel?**) +  - {{ tog:tog2024june-buijs-systemandnetworkmanagementatjive.pdf | System and network management at JIVE }} (**Buijs**) 
-  Field System status/update(s) (**Himwich**) +  Recorder status? 
-  VLBA/NRAO update (**Hunt**) +      {{ :tog:tog-ncftp-2024.pdf |NcFTP station->JIVE slow speed}} (**Feiler, everyone**) 
-  Next TOG Meeting+  - {{ :tog:lindqvist-craf-tog-june-2024.pdf |RFI monitoring, CRAF, SpaceX/Starlink}} (**Lindquist**) 
 +  - {{ :tog:weh_tog_june_2024.pdf | Field System status/update(s) }} (**Himwich**) 
 +  VLBA/NRAO update (**Hunt**} 
 +  Next TOG Meeting
  
 == Wednesday 26 June 2024 == == Wednesday 26 June 2024 ==
Line 37: Line 40:
   * 8:00 AM Bus leaves for Onsala Observatory from the hotel   * 8:00 AM Bus leaves for Onsala Observatory from the hotel
   * 9:00 AM Divide into two groups, two ~45min activities in parallel, then switch:   * 9:00 AM Divide into two groups, two ~45min activities in parallel, then switch:
-      - DBBC3 hands-on + e-VLBI recap + e-VLBI with the DBBC3+      - DBBC3 hands-on (**Yang**) {{ :tog:evlbi.pdf | e-VLBI recap }} (**Eldering**)
       - Tour of the observatory       - Tour of the observatory
   * 10:30-11:00 coffee break   * 10:30-11:00 coffee break
Line 46: Line 49:
 === Station Reports === === Station Reports ===
  
-Available [[ |tbd ]] +Available [[[tog:station_reports_2024|here]] 
  
 ---- ----
  
tog/june-2024-goteborg.1718709720.txt.gz · Last modified: 2024/06/18 11:22 by verkouter